This self-storage construction case study highlights how Heartland Building Group expanded a facility to meet growing demand. Our team delivered efficiency, safety, and modern design at every stage.
Client Needs & Goals
A national logistics company faced growing operational demands and needed underground fuel tanks to support its large fleet. The client wanted a partner who could expand the facility while keeping it operational. In addition, they required strict compliance with safety and environmental regulations. Heartland Building Group understood these goals and provided a plan that balanced expansion with efficiency and safety.
Project Overview – Self-Storage Construction with Fuel Tank Installation
The project called for multiple underground fuel tanks at a logistics hub. Heartland Building Group managed every phase of construction — from soil testing and excavation to installation and inspection. Because the facility remained active, we developed a detailed schedule and phased approach. As a result, the client experienced minimal disruption while we advanced construction safely and efficiently.
Scope of Work in This Construction Case Study
We performed a wide range of tasks to deliver a reliable fueling system:
- Site Preparation & Soil Testing – We analyzed soil conditions and graded the site for stability.
- Excavation for Multi-Tank System – Our crews executed precise excavation while protecting nearby structures.
- Installation of Xerxes Fiberglass Fuel Tanks – We installed durable tanks designed to resist corrosion.
- Backfilling & Compaction – Our team ensured stability by carefully compacting soil layers.
- Safety Measures & Environmental Controls – We added leak detection, spill prevention, and EPA-approved monitoring systems.
- Integration with Fueling Infrastructure – Our experts connected tanks with pumps, monitors, and electrical systems.
- Vendor & Inspector Coordination – We worked directly with suppliers and regulators to keep approvals on track. Moreover, each phase was checked against compliance standards, which reduced risks and kept the project moving forward.
Challenges in Fuel Tank Installation Projects
Keeping the logistics hub operational created the greatest challenge. To solve this, we separated work areas and scheduled construction around the client’s operations. Consequently, the fleet continued its activities without major interruptions. Environmental compliance also posed challenges. Every task required oversight to meet federal and state regulations. However, our experience with similar projects allowed us to anticipate issues and resolve them quickly.
Why Heartland Building Group
The client chose Heartland because of our proven history with self-storage and fueling system construction. We combined both skill sets to provide a solution that met their operational and compliance needs. We bring measurable value by:
- Delivering projects nationwide with consistent results.
- Maintaining a zero-incident safety record.
- Keeping clients informed through clear communication.
- Finishing projects on time and within budget. Therefore, the client gained not just a builder, but a long-term construction partner.
Results of the Self-Storage Construction Case Study
We completed the project on schedule and within budget. The new fueling system is durable, efficient, and fully compliant with all environmental regulations. As a result, the logistics hub can now support larger fleet operations with improved efficiency and safety. In fact, the facility is better prepared for long-term growth and industry demands.
Learn more about our Self-Storage Construction Services and how Heartland Building Group delivers projects on time, within budget, and built right the first time.